This article about Cladding, the Lacrosse Tower Fire Decision and the importance of statutory warranties has been supplied by David Bannerman, Bannermans Lawyers.
The Victorian Civil and Administrative Tribunal (“Tribunal”) handed down an award on 28 February 2019, which ultimately holds the Builder liable for breach of statutory warranties with the Building Certifier, Architect and Fire Design Engineer liable to indemnify the Builder for 97% of the $5.7 million losses assessed to date, which included $100,000 for strata managers fees and $700,000 for increases in insurance premiums.
Although, yet to be resolved it seems likely that a similar finding will be made with respect to other non-agreed items such as bringing unburnt parts of the building into compliance, loss of rental and accommodation expenses valued at $6.8 million.
GET THE LATEST STRATA NEWS / ARTICLES DIRECT TO YOUR INBOX HERE
The Tribunal found that primary liability lay with the Builder (LU Simon) for breaching statutory warranties under Victoria’s Domestic Contracts Act 1995. However, the Tribunal also found that to the extent the Builder was liable to the Owners, the Builder was entitled to be compensated by the consultants that it relied upon in deciding to use Alucobest cladding panels.
The fire was started by an unextinguished cigarette butt. Around midnight on 24 November 2014, one of the occupants of unit 805 had a smoke on the balcony before going to bed. He put the butt in a plastic food container on a timber table which was used as an ashtray and contained aluminium foil with a small plant, some seeds and other cigarette butts.
The unextinguished cigarette butt transitioned to flames when it came into contact with the packet of seeds and the fire spread to the plastic container and then to the timber table. From there the fire spread to the combustible material located nearby, probably including the washing basket of clothes, a nearby vacuum cleaner and the air conditioning unit. The air conditioning unit seems to have been the point at which direct flame came into contact with the Alucobest cladding.
The smoke detector within the unit had been covered with tin foil, but at 2.23am the smoke detector in the hallway outside the unit activated. By the time the fire brigade got there at 2.29am, the fire was travelling rapidly up the external cladding onto balconies at every level.
The central finding of the Tribunal was that the primary cause of the spread of the fire was the use of an Aluminium Composite Panel with 100% polyethylene core as the external cladding, noting that polyethylene has a calorific value similar to petrol, diesel and propane.
Under a design and construct contract with the Developer, the Builder was primarily responsible for the external cladding selected. The Builder claimed that each of the Building Certifier, Architect, Superintendent and Fire Design Engineer failed in their “duty of care” to provide warning of the potentially disastrous consequences of that selection.
The Tribunal considered each of the consultant's responsibilities through a detailed analysis of the terms on which they had been engaged, the correspondence and advice through the design development and construction phase, and the enquiries and testing conducted by each of the consultants.
The Tribunal was particularly critical of the lack of rigour in invoking “deemed to satisfy” provisions in order to claim compliance with the Building Code of Australia; noting substantial literature expressing concerns about the core material existed as early as 1968, and a specific advisory issued by the Australian Building Codes Board in 2010 which should have alerted experts of the need for particular care.
The Wrongs Act 1958 in Victoria allows for liability to be apportioned between several parties where they are all to some degree legally responsible for loss and damage suffered. New South Wales has similar provisions under its Civil Liability Act 2002. Having regard to the specific conduct of the consultants in this case the Tribunal held that the consultants should compensate the Builder for the amount the Builder was required to pay the owners in the following proportions:
Lookupstrata Directory
Looking for NSW Strata Specialist in your area? Search within our LookUpStrata Directory for the best list of contacts available
Search the directoryDiscover Information By
Living in Strata
Comments
Log in to leave a comment